Speedskater
Member
It doesn't even need to be a sub-panel. With a US type system, just run a heavy feeder (say 40 to 60 Amps) to a central point in the listening room and use a small 6 breaker box.How many people have spent more on P.C's than it would have cost to either put in a dedicated sub-panel with it's own ground or better yet gone with -60 | 0 | +60 balanced power?
What the heck does 'it's own ground' mean?
Note that a balanced power system comes with lots of added NEC rules.