My INT finally arrived after being shipped from Geneva on April 5th (2 weeks). The shipment reached India but was in customs for about 16 days - a few days were on me as I had to send in the required documents for clearance. True to their word, Job picked up the tab on the shipping, customs, etc and the package was delivered to my door yesterday evening. Amazing if you ask me!
If only I could say the same for the local DHL delivery. My wife told me that they delivered it rolling the box end over end! My heart sank on hearing this. Sure enough after opening the box, I felt something moving inside the case. Not a lot but enough to cause concern. On opening the top cover (Metric 2.5 mm Allen Key needed) I found that the nut securing the toroid transformer was loose. Whew! Everything else was secure. The inside of the top cover did suffer a few scratches unfortunately.
Feedback to Job: Shipping to certain countries will need the "Handle with Care" and "This Way Up" stickers along with the usual fragile declarations. Needless to say but my INT survived some pretty shoddy handling in 45 C (113 F) temperature. Customers elsewhere rest assured that packing quality is adequate.
Right now I am just happy that it has arrived. Listening impressions to follow ...