- Thread Author
- #1
Hi there I am in the midst of getting my dedicated lines installed in my music room. So far have planned for a subpanel to be installed at about 2' away from my mains.
The reason for a subpanel is because my main panel is fully occupied so my electrician advised for a subpanel to be installed. They will be feeding my audio circuits only. I will be installing 2 lines rated at 20amps using 10awg.
I did the measurements and the length of my lines from the subpanel to the first outlet is 48' in length and the other outlet will be 55'. Both of the outlets are placed over at each end left and right side of front wall.
Everything seems to be fine but I have some questions that I'm still not sure of.
1) Which will be a better option shorter run of cable between the main panel to subpanel and longer run of cables between subpanel to the outlets OR a longer run from main panel to the sub panel and shorter run from sub panel to my outlets?
2) There is a discrepancy of 7' in length between both dedicated lines to the outlet. I read around and some advocate to keep it at same length this is to avoid differances between both grounding line potentials, but this seems to be hard for me to do so. Will this be an issue causing all sorts of noise when I use both outlets? Or is this just a theoretical thing that actually doesn't cause any issues? I did try to re run those lines but it is hard due to those lightings installed.
My lines are grounded to the same point at the subpanel and then back to the main panel grounding bussbar.
So to my friends here please do advice me on how should I go about it. Will I have any issues that I should take note of?
The reason for a subpanel is because my main panel is fully occupied so my electrician advised for a subpanel to be installed. They will be feeding my audio circuits only. I will be installing 2 lines rated at 20amps using 10awg.
I did the measurements and the length of my lines from the subpanel to the first outlet is 48' in length and the other outlet will be 55'. Both of the outlets are placed over at each end left and right side of front wall.
Everything seems to be fine but I have some questions that I'm still not sure of.
1) Which will be a better option shorter run of cable between the main panel to subpanel and longer run of cables between subpanel to the outlets OR a longer run from main panel to the sub panel and shorter run from sub panel to my outlets?
2) There is a discrepancy of 7' in length between both dedicated lines to the outlet. I read around and some advocate to keep it at same length this is to avoid differances between both grounding line potentials, but this seems to be hard for me to do so. Will this be an issue causing all sorts of noise when I use both outlets? Or is this just a theoretical thing that actually doesn't cause any issues? I did try to re run those lines but it is hard due to those lightings installed.
My lines are grounded to the same point at the subpanel and then back to the main panel grounding bussbar.
So to my friends here please do advice me on how should I go about it. Will I have any issues that I should take note of?